Some clarifications for the Commercial Management Assignment
George Blumberg
This is a simulation study where the student is expected to take on the role of an advisor to a client who is both the developer and owner of the site.
1. The main task for the student is to present this prescribed version of the development brief.
2. The granting of planning permission is a potentially uncertain process with no guarantee of an absolute outcome. However, for the purposes of this assignment, we can assume that obtaining planning permission for either end use will be granted.
3. The text “Figure 1” at the bottom of Page 1 should read “Figure 2”, The original plan sketch, which be found at the top of Page 2.
4. The sketch was produced by an architect some time ago as part of the Strategic Definition phase.
5. The basic quantities for the development are based on the office building design.
6. Approximate dimensions length, width and height can be derived from the tables on external area and from the drawing. Exact dimensions are not critical for this exercise.
7. The architect produced only a simple layout is not very simplistic. Is it possible to have a section in two directions of the building?
8. We assume that the planning consent for the conversation will be granted including the parking, environmental codes and change of use. The development meets the criteria required by the planning authorities.
9. Although the main contactor has not been chosen yet, the client has authorised this study.
10. The section, Specific Requirement, shows that this assignment is open ended and request students to face the challenges imposed.
11. There’s a large number of reasonably direct sections, but it requires that you development strategy for construction, development appraisal and cost budget, schedule of build, financial detail, estimate of profits, cash flow curve, revenue forecast, energy conservation measures and so on, strategy for Future-Proofing and building configuration plan to 2 or 3 story’s, development options, adoption of BIM system.
12. The above task is interesting and challenging. I look forward to fulfill the requirements.
13. 50 parking space were allocated in part due to planning restraints and preliminary feedback from the City. It is anticipated that additional space could be added as some later point if a suitable argument was presented.
14. We require dimension to calculate the rentable area. Unless we floorspace ratio factor and multiply it by the gross area?
15. Ofcourse the floor space efficiency ratio will vary subject to its final use.
16. From expected annual income from rental, can we charge “service charge’? if so what rate can we use?
17. From parking options, the table indicates basement? Please clarify.
18. From initial estimates of building costs, for the professional fees, the table states “see note”. Please provide us with the note if required.
19. Financial Viability calculation.The table states Land purchase from month 1. Why? Is not the Client , site owner and the developer the same? Unless the exercise would like us to consider the value of the land into our calculation for which we could assume average market value.
For a custom paper on the above topic, place your order now!
What We Offer:
• On-time delivery guarantee
• PhD-level writers
• Automatic plagiarism check
• 100% money-back guarantee
• 100% Privacy and Confidentiality
• High Quality custom-written paper
You May Also Like This:
- Commercial Law
- Project Management for Construction
- Development Control (traffic engineering )
- operation management
- Language Rich Environment
- Project Management Plan PMP
- Project Management (Mature Project Management at Borsch Gruppe)
- Management of Project Risk, Quality and Safety
- Iowa Steakhouse
- Supply chain management.
- Democrats and Republicans
- Management Brief:EvaluatingInternationalization strategy
- Information Management for Decision Making
- Project Management Leadership and Skills: Planning and Control
- Appraise and perform management functions including planning and controlling
- National banking
- Practice Problems: Inventory Management
- Introduction to Print Reading
- Statistics for Health Management Decision Making
- Management Accounting, simulations & linear programming
- Risk Management on a Satellite Development Project
- resolving the global human capital management problems associated with AGC
- Operation Management Exam
- Project implementation process
- Project Management for Small to Medium Enterprises
- Project Management
- Management of TNA
- Major degradation issues that have arisen from development
- Strategic Management Part 1
- management