1. (12 pt.) Lets assume that you are a Principal Systems Engineer designing a robot that aims to mobilize people and supplies during emergency situations. The prototype would be tested against various simulated emergency aid capabilities, such as fire extinguishing, hurricane evacuation, suicide prevention, bomb threat mitigation and SWAT operations.
a) (2 pt.) Based on your research and analysis, identify 3 preliminary quality factors you would like to implement in the robot outlined above. Present the factors using a Quality Management and Control Tool so they can be discussed with your team and ideas from team members can also be included.
b) (2 pt.) Provide brief descriptions for each of the quality factor.
c) (3 pt.) During quality planning, you are creating a quality checklist to verify that the robot will detect heat and follow a path towards the possible fire while acting as a fire extinguisher. While searching for a path using only one heat sensor near its head, the robot will be performing the following activities:
i. Detect heat
ii. Move towards heat
iii. Move backward up to 1 ft. if there is an obstacle
iv. Move left up to 1 ft. v. Send SOS, if no moves can be performed
Use a flowchart to demonstrate how decisions would be made to move towards the heat source from the steps above (Only blocks and arrows are sufficient, handwritten flowchart can be inserted in word document too ).
d) (2 pt.) List and briefly describe 3 risks or potential causes that might make the robot immobile or inoperable during emergencies.
e) (3 pt.) Consider the following parts costs to build an initial robot prototype
Place your order now for a similar paper and have exceptional work written by our team of experts to guarantee you A Results
Why Choose US
6+ years experience on custom writing
80% Return Client
Urgent 2 Hrs Delivery
Your Privacy Guaranteed
Unlimited Free Revisions
You May Also Like This:
- Management of Project Risk, Quality and Safety
- NR532 Week 7: Quality of Healthcare Assignment Clearly introduce your quality of healthcare assignment in the introduction paragraph. Include a sentence that states the purpose of your assignment.
- Work-based Project Plan – Project Management
- cost accounting writing assignment
- NR443-14471 Week 4: Direct Care Project Part 2 For this part of the direct care project, you will be creating a PowerPoint presentation based on the topic and problem identified in Part 1. If you chose air quality as your topic, you will present on the Air Quality Flag Program. If you chose substance use, you will present the SBIRT intervention model.
- Project Management (Mature Project Management at Borsch Gruppe)
- Quality management
- Assignment 4: Project Schedule
- Risk Management on a Satellite Development Project
- Understanding the role of project management methodologies and technologies to improve project success rate in Construction or IT
- Improving Project Management performance in the UAE through Effective Interdependency Management
- Critical Appraisal of a published Economic Evaluation of Cost Effectiveness or Cost Utility of a Health Intervention
- Project Management Plan PMP
- Quality Assurance in Healthcare Systems
- Quality Management Tools
- review of the literature: Quality Management
- Subject: Quality and Value Management.
- Quality management (Due Sunday early evening)
- Project Management Plan
- Project Management for Small to Medium Enterprises
- project management approaches
- Project Scheduling
- NR 351 Week 2 Assignment: Time Management Plan Assignment
- management
- Project Management for Construction
- Project Management
- Project Management Paper
- Project Management Leadership and Skills: Planning and Control
- PROJECT MANAGEMENT TECHNIQUES
- Assignment 2: Project—Identifying a Phenomenon