CE7011 Assignment 2015-16
This assignment represents 70% of the overall assessment of this module. The remaining 30% is the online test previously undertaken.
This assignment is a combination of group work and individual effort.
You will work in groups of two-three to review documents and generate a:
stakeholder analysis
risk register
programme
You will submit a hard copy and soft copy of the above documents.
As an individual you will also provide a
maximum 2 page summary of you and your team’s behaviours (Arial font 11)
maximum 4 page Executive Summary (Arial font 11). This should be the cover sheet
with contents and three pages of text comprising the executive summary.
The scenario
Kingston University is replacing the existing Town House on its Penrhyn Road campus. This will involve the demolition of the existing structure and the construction of a new structure.
The project is currently in the planning stage, awaiting the decision from the Local Planning Authority (LPA), for Planning Consent to build the proposed new Town House (construction cannot legally commence prior to receiving Planning Consent).
The Client has made it clear that cost is his key priority, it cannot be increased. In response to your questions, she has confirmed to you that quality is important but of much lesser importance than cost. Time is more important than quality but less important than cost.
You have recently started work for the company responsible for the project management of delivering this project as the previous project manager has left the company, his files are not available to you.
You take over the project when planning permission has been applied for, but not granted.
As the incoming project manager you realise there is no risk register for this project and that the programme has not been developed for the next stage (from planning to handover of finished product). There is also no stakeholder analysis.
You must prepare a project risk register and programme to cover the remainder of the project (from receiving planning permission to hand over to the Client) as well as carry out a stakeholder analysis.
You must also prepare an Executive Summary to brief the Client on the project that should include reference to the findings of your programme, risk register and stakeholder analysis. This should be a maximum of 3 sides of A4 (Arial font 11).
For a custom paper on the above topic, place your order now!
What We Offer:
- On-time delivery guarantee
- PhD-level writers
- Automatic plagiarism check
- 100% money-back guarantee
- 100% Privacy and Confidentiality
- High Quality custom-written paper
You May Also Like This:
- Risk Management on a Satellite Development Project
- Project Management Plan PMP
- Work-based Project Plan – Project Management
- Project Planning, Control and Risk
- Implementing Risk Management
- project management approaches
- Project Management (Mature Project Management at Borsch Gruppe)
- Project Cost and Quality Management Assignment
- CRITICAL ANALYSIS OF THE PROJECT MANAGEMENT PLAN
- Project Management for Small to Medium Enterprises
- NR443-14471 Week 4: Direct Care Project Part 2 For this part of the direct care project, you will be creating a PowerPoint presentation based on the topic and problem identified in Part 1. If you chose air quality as your topic, you will present on the Air Quality Flag Program. If you chose substance use, you will present the SBIRT intervention model.
- Project Management Plan
- Principle of Risk Management and Insurance
- Security and Risk Management
- Project Management for Construction
- Safety, Quality, and Informatics
- quality and safety in healthcare
- Understanding the role of project management methodologies and technologies to improve project success rate in Construction or IT
- Risk management framework
- review of the literature: Quality Management
- Risk Register
- Project Management Leadership and Skills: Planning and Control
- Business Risk Analysis of GPT Group and preparation of an audit strategy
- Project Management
- The Role of the Leader in Evaluating Data to Improve Quality and Safety Paper
- Subject: Quality and Value Management.
- Managing Risk
- Quality Management Tools
- Project Management Paper
- How would you apply the principles of the Triple Aim initiative to improve quality, safety and satisfaction in the acute care or long-term care setting?